中文版
 
热烈庆祝山东铁鹰建设工程有限公司网站改版!热忱欢迎各界人士来我公司考察合作!
 

Factory 
(High-speed rail inspection vehicle track and column bracket.)
(High-speed rail inspection vehicle track and column bracket. )
 (The pier and Bridge template)
(Template pier column)
(Prefabricated box girder template) 
( Prefabricated T beam formwork) 
(Hanging blue template) 
(The tunnel template) 
(Transverse bending of variable surface template) 
( Hydraulic lining trolley) 
( scientific research and patent)
(Export production)

 

·Manager Yin: +18661300030
·Manager Zhao: 18661300020
·Manager Yang: 18553806317
·Manager Zhang: 18661300016  
·Business phone number: 0538-6629808   6629817
·Human resource phone number: 0538-8708888   +8618661300028
·mobile phone :+8618661300028
·fax:0538-6629802
·address:  East Manxing Road ,Daiyue District, Tai'an City,Shandong,China
·E_mail:tieyinggongsi888@126.com 
·Q Q:251373249 

  Template  

rail inspection vehicle track and column bracket for high-speed railway



    The inspection vehicle track and bracket, single round column pier bracket (span 32.7m, 24.7m), and hyperbola round end pier bracket (d=2m, 2.3m, 2.5m, 2.8m) for Jinhu high-speed railway, fabricated and installed by the company in 2009 and 2010. The project won great reputation for quality and design. The following are its technical requirements:

The inspection vehicle track and bracket installation for Jinghua High-speed railway

No.

Inspection items

Allowance (mm)

Remarks 

1

T=distance from the upper side of the base plate of vertical bracket to base of the box beam

T±2.0mm

2

T=distance from the center of the base plate of vertical bracket to the vertical center of the box beam 

T±2.0mm

3

The distance from the center of base plate of vertical bracket to the center of the base plate of horizontal bracket

T±2.0mm

4

T=span of the inspection track

T±2.0mm

5

△=relative differences of the inspection track

△≤2.0mm

6

△=the height difference of the 2 tracks on the same level

△≤1.5mm

7

Local side bending of the inspection track

≤1.5mm/m

8

Overall side bending of the inspection track

length≤10.5m,deviation≤6mm      

length≥10.5m,deviation≤10mm

9

Side dislocation for the connection of the inspection track

≤1.5mm

10

Height difference between the connection of the inspection track

≤1.0mm

11

检查车轨道接头处间隙

≤5mm


京沪高铁

rail inspection vehicle track and column bracket for high-speed railway

版权所有:山东铁鹰建设工程有限公司   鲁ICP备16027718号  技术支持:百度泰安·中迅信息